DARBHANGA · BIHAR · INDIA

Together, build a place to belong.

A proposed permanent home for worship, prayer and community facilities in the Mabbi Belauna / Mabbi area. The preliminary capital goal is ₹62.65 lakh. This image is an architectural concept, not a completed building or an approved final design.

From a gathering to a lasting home

The supplied ministry account reports a fellowship of 55–60 believers and four serving teams. The Church Worship Centre, Land Acquisition & Community Facilities proposal seeks a stable place for worship, discipleship and care. It proposes 5,000 sq. ft. of land in the Darbhanga area. The exact plot, ownership, title, access and suitability require confirmation; the proposal does not establish that land has already been purchased.

Practical facilities with a shared purpose

The plan includes an approximately 2,000 sq. ft. worship hall with a steel shed roof, two washrooms, handwashing, water storage and septic arrangements. A boundary wall, entrance gate, electrical installation, platform and basic seating are also proposed. Final dimensions, engineering, layout and permissions remain subject to professional review and approval. The illustration does not promise that every pictured detail will be included.

A preliminary budget of ₹62.65 lakh

The October 2026 preliminary detailed project report totals ₹62,65,000. Its allowances are: land ₹20,00,000; registration, stamp duty and legal allowance ₹1,90,000; site preparation ₹70,000; foundation, plinth and flooring materials ₹6,00,000; steel frame and roofing ₹9,00,000; walls, doors and windows ₹3,20,000; two toilets and sanitary fittings ₹2,40,000; electrical work ₹1,25,000; boundary wall materials ₹4,80,000; gate ₹85,000; water and septic system ₹1,40,000; platform, seating and furniture ₹1,50,000; separate labour ₹5,50,000; engineering, drawings and permissions ₹65,000; and contingency ₹3,50,000. These planning figures require verification, a detailed bill of quantities and quotations. The total is a funding goal, not an amount raised or an audited remaining gap.

A conditional, phased roadmap

The indicative programme is 9–12 months after the necessary funds, approvals and land possession. The report outlines land diligence and acquisition in months 1–3, survey and design in months 2–4, foundations and roof in months 4–8, amenities and site protection in months 7–10, and fittings and review in months 10–12. Phases may overlap. These are planning periods, not current construction progress or a guaranteed completion date.

Begin a thoughtful partnership

You can discuss the whole project, a particular component, construction materials, professional skills or prayer support. Contact supernaturalfoundation@gmail.com for updated project documents, verified giving arrangements and the intended use of a proposed contribution. An enquiry records your interest; it is not a payment or a confirmed pledge. Confirm the current project position directly before making a contribution.